Casmalia Disposal Facility Assessment
Santa Barbara County, California
C2 REM provided representation during negotiations with USEPA as a technical consultant for a group of PRPs. C2 REM developed remediation approaches and negotiated/obtained Cost Cap insurance quotes from consultant and insurance firm teams for entire site remediation activities initially estimated at over $100 million.


Electrical Equipment Recycling Facility
Pico Rivera, California
C2 REM is the Environmental Coordinator/Consultant for a group of Potentially Responsible Parties for this California Superfund site. Work includes: Agency interaction/negotiations, preparation of a Remedial Investigation/Feasibilty Study (including, Baseline Risk Assessment); preparation of a Remedial Action Plan; installation and sampling and analysis of on/off-site groundwater monitoring wells, and stormwater sampling activities.
Del Amo Waste Pits
Torrance, California
C2 REM's work included oversight and coordination of the design and construction of a RCRA equivalent cap as well as a gas collection system and monitoring well probe network. C2 REM continues performing operation, maintenance and monitoring of the RCRA cap and gas collection treatment system to assure the integrity of the completed containment system and associated components. Additionally, C2 REM continues to assist the client in ongoing evaluations of alternative technologies for a site soil vapor extraction and treatment systems.

Copyright 2001 C2 REM. All rights reserved.